Foundation
Capture the structural baseline for the property before moving into later families.
Foundation Option
Construction Style
Frame
Confirm the primary structural frame for the property.
Floor Structure
Identify the main structural floor system supporting the property.
Floor Cover
Capture the flooring mix for the property using percentages that total 100%.
Primary Floor Finish
Flooring Mix
Built-In Appliances
Count the built-in residential equipment included with the rental property.
Appliance Group
Site Work
Capture land-improvement and exterior site areas that may support 15-year treatment.
Site-Improvement Group
Mechanical Systems
Record the core mechanical, plumbing, and lighting counts used in the report math.
Major System Category
HVAC Type
Roof Systems
Capture the roof structure baseline, covering type, and condition.
Roof System
Roof Covering
Roof Condition
Exterior Wall
Choose the dominant exterior wall finish for the property.
Sprinklers
Record whether the property includes a fire-sprinkler system.
Sprinkler Condition
Specialties
Capture any specialty construction or decorative features that should be tracked for future refinement.
Specialty Feature
Interior Construction
Capture the overall interior-construction level and any interior measurements you know.